Mirani dam is located on the Desht river about 30 miles (48 Km) west of Turbat in the Makran division, Balochistan, Pakistan. The Project is located about 380 miles South-West of Quetta. It has Central Makran Range in the north and is located on the confluence of two rivers i.e. Kech and Nihang.
The Project aims at provision of dependable water supply for development of Irrigated agriculture on both banks of the Dasht River. This was the first Engineering Procurement & Construction (EPC) contract in the water sector Under WAPDA’s Vision2025 Water & Power Development Programme.
The contract was awarded in June 2002 to Mirani Dam Joint Venture (MDJV) consisting of three local construction companies for Completion of the Project within a period of 4 Years.
A joint venture of local and fireign consultants, Led by NESPAK, provided the Management Consultancy Services to WAPDA for the Project.
The project was completed in 2007.

Hydrology  
Total Catchment area7,964 sq. miles20,627 Sq. km
Total Catchment area7,964 sq. miles20,627 Sq. km
Average annual rainfall4.21 inches107 mm
Average annual flow223,000 acre ft.275 MCM
Maximum probable flow623,860 cusecs17,668 cumecs
DAM  
TypeConcrete Faced Rockfill Dam (CFRD) 
Maximum Height127 ft.38.7 m
Crest Elevation (SPD)El. 268 ft.81.7 m
Length3,080 ft.939 m
RESERVOIR  
Area17,982 acres7,277 hectares(87 sq-km)
Gross Storage302,000 acre-ft.372 MCM
Live Storage152,000 acre-ft.187 MCM
Normal conservation level (SPD)El. 244 ft.El. 74.4 m
Highest flood level (SPD)El. 276 ft.El. 84.1 m
Average Annual Releases114,000 acre-ft141 MCM
SPILLWAY  
TypeUngated with stilling basin< 
Design capacity205,800 cusecs5,856.7 cumecs
Maximum capacity384,300 cusecs10,883.6 cumecs
Waterway (ogee length )600 ft.182.9 m
Crest LevelEl. 244 ftEl. 74.4 m
IRRIGATION OUTLET  
TypeSteel conduit 
Diameter6 ft.1.8 m
Capacity377 cusecs10.7 cumecs
Length1,490 ft.454 m
LOW LEVEL OUTLET  
TypeSteel conduit 
Diameter3 ft.0.9 m
Capacity120 cusecs3.4 cumecs
Length855 ft.260.6 m
IRRIGATION SYSTEM  
TypeGravity, lined canals 
Total command area33,200 acres13,436 hectares (160.7 sq-km)
On Left bank12,400 acres5,018 hectares (60 sq-km)
On right bank20,800 acres8,418 hectares (100.7 sq-km)
Left Bank Canal  
Design discharge141 cusecs4 cumecs
Length11.84 miles19 km
No. of Distributaries / minors / water courses04 / 18 / 77 
Right Bank Canal  
Design discharge236 cusecs6.7 cumecs
Length12.55 miles20.2 km
Total Project CostRs. 6,959 millionUS $ 87 million
RAP CostRs.1,688 millionUS $ 21 million
Land affected19,038 acres7,705 hectares(92 sq-km)
Economic Internal Rate of Return E.I.R.R12%